Construction formwork manufacturers said that in the installation, the joints should not be too tight, after the installation should be watered wet, so that the wood joints closed.
The interior of the building formwork must be cleaned up. The debris left in the building formwork will cause defects such as slag inclusion in concrete. In order to clear the building formwork, the sweeper should be reserved. For building formwork, isolators should be painted, and when painting, oily isolators should be selected that do not affect the structure and hinder the construction of decoration and decoration projects. At the same time, because the isolator contaminates the joint of steel bar and concrete, it may cause obvious adverse effects on the mechanical properties of concrete structure, so it is necessary to avoid contaminating steel bar when painting.
When supporting building formwork, the requirements for embedded parts and reserved holes should be to fix the embedded parts, reserved holes and reserved holes on the building formwork at the same time, without leaving them, the size meets the requirements, and the installation is firm.